序号item |
工程项目
project |
项目吨位project scale |
业主
ownner |
工期work period |
施工地点
site |
脚手架标准standard of scaffolding |
1 |
蓬莱19-3一期项目导管架、组块的防腐喷涂及脚手架搭拆工作Blasting and painting, scaffold erectionand dismantlement of Jacket & module in Penglai19-3 phase 1 project construction |
6500
Tons |
Conocophilips |
12 months |
Tanggu yard of CNOOC |
AS |
2 |
渤海二期项目导管架、组块的防腐喷涂及脚手架搭拆工作Blasting and painting, scaffold erectionand dismantlement of the module and jacket in Bohai phase Ⅱ project construction |
3600 Tons |
Bluewater & Conocophilips |
18 months |
Shenzhen Chiwan Yard |
GB |
3 |
文昌15-1A/19-1A导管架项目的防腐喷涂及脚手架搭拆工作Blasting and painting, scaffold building and dismantlement of theWC15-1A/19-1A jackets in Wenchan phase Ⅱ project construction |
11200 Tons |
CNOOC |
14 months |
Shenzhen Chiwan Yard |
GB |
4 |
西江23-1导管架项目的防腐喷涂及脚手架搭拆工作Blasting and painting, scaffold erectionand dismantlement of the 23-1 Jacket in Xijiang project construction |
6700 Tons |
CNOOC |
12 months |
Shenzhen Chiwan Yard |
BS |
5 |
Montara导管架项目的防腐喷涂及脚手架搭拆工作Blasting and painting, scaffold erectionand dismantlement of the Jacket in Montara project construction |
3500 Tons |
Coogee of Australia |
9 months |
Shenzhen Chiwan Yard |
GB |
6 |
Angel项目的防腐喷涂及脚手架搭拆工作Blasting and painting, scaffold erectionand dismantlement of the Jacket in Angel project construction |
7800 Tons |
Woodside of Australia |
13 months |
Shenzhen Chiwan Yard |
BS5973/5 |
7 |
Pluto LNG 导管架项目的防腐喷涂及脚手架搭设拆除工作Blasting and painting, scaffold erectionand dismantlement of the Jacket in Pluto LNG project construction |
9918 Tons |
Woodside of Australia |
16 months |
Shenzhen Chiwan Yard |
BS5973/5 |
8 |
USGIF项目的防腐喷涂及脚手架搭设拆除工作 Blasting and painting, scaffold erectionand dismantlement of the Jackets, bridges, flare towers in USGIF project construction |
22000 Tons |
Hyundai of Korea; Adma Corporation |
in progress |
Shenzhen Chiwan Yard |
GB |
9 |
涠洲11-1N导管架项目的脚手架搭拆工作Blasting and painting, scaffold erectionand dismantlement of the WZ11-1N Jacket in Weizhou project construction |
1800 Tons |
CNOOC |
8 months |
Shenzhen Chiwan Yard |
GB |
10 |
南海FPSO上部模块的脚手架搭拆工作Scaffolding erectionand dismantlement of topside modules in Nanhai FPSO project construction |
5971 Tons |
CNOOC |
7 months |
Qingdao Yard of CNOOC |
AS |
11 |
渤中34-1WHPB/A导管架、生活楼项目的搭拆工作Scaffolding building and dismantlement ofBZ34-1WHPB/A/CEP jackets and living quarter in Bozhong project construction |
9600 Tons |
CNOOC |
11 months |
Qingdao Yard of CNOOC |
AS |
12 |
文昌14-3导管架项目的脚手架搭拆工作Scaffolding building and dismantlement of WC14-3 jacket in Wenchang project construction |
3060 Tons |
CNOOC |
12 months |
Qingdao Yard of CNOOC |
AS |
13 |
锦州9-3E项目的脚手架搭设拆除工作Scaffolding erection and dismantlement of JZ9-3E module in Jinzhou project construction |
1500 Tons |
CNOOC |
10 months |
Qingdao Yard of CNOOC |
AS |
14 |
600吨门式起重机的脚手架搭设拆除工作Scaffolding building and dismantlement of the 600T gantry crane project construction |
2400 Tons |
CNOOC |
5 months |
Qingdao Yard of CNOOC |
AS |
15 |
渤中项目BZ28-2S CEP脚手架搭设拆除工作Scaffolding erectionand dismantlement of BZ28-2S CEP jacket,module and living quarter in the Bozhong project construction |
6013 Tons |
CNOOC |
11 months |
Qingdao Yard of CNOOC |
AS |
16 |
惠州HZ25-3/1 项目导管架的脚手架搭设及拆除工作Scaffolding erectionand dismantlement of HZ25-3/1 jacket in Huizhou project construction |
4750 Tons |
CNOOC |
8 months |
Qingdao Yard of CNOOC |
AS |
17 |
惠州HZ25-3/1项目脚手架搭设拆除工作Scaffolding erectionand dismantlement of HZ25-3/1 module in Huizhou project construction |
4347 Tons |
CNOOC |
9 months |
Qingdao Yard of CNOOC |
AS |
18 |
惠州HZ25-3/1 DES项目脚手架搭设及拆除工作 Scaffolding erectionand dismantlement of HZ25-3/1 DES drilling rig module in Huizhou project construction |
1156 Tons |
CNOOC |
9 months |
Qingdao Yard of CNOOC |
AS |
19 |
惠州HZ25-3/1 DSM项目钻井平台的脚手架搭设及拆除工作 Scaffolding erectionand dismantlement of HZ25-3/1 DSM drilling rig module in Huizhou project construction |
1060 Tons |
CNOOC |
9 months |
Qingdao Yard of CNOOC |
AS |
20 |
越南MODEC项目的脚手架搭设拆除工作Scaffolding erectionand dismantlement of topside module in MODEC Vietnam project construction |
7000 Tons |
MODEC |
7 months |
Qingdao Yard of CNOOC |
AS |
21 |
巴西MOODEC项目脚手架搭设及拆除工作Scaffolding erectionand dismantlement of topside module in MODEC Brazil project construction |
6410 Tons |
MODEC |
10 months |
Qingdao Yard of CNOOC |
AS |
22 |
乐东22-1项目压缩机组块的脚手架搭设拆除工作scaffolding erectionand dismantlement of LD22-1 compressor module in Le dong project construction |
800 Tons |
CNOOC |
6 months |
Qingdao Yard of CNOOC |
AS |
23 |
乐东22-1组块脚手架搭设拆除工作Scaffolding building and dismantlement of LD22-1 module in Ledong project construction |
3300 Tons |
CNOOC |
14 months |
Qingdao Yard of CNOOC |
AS |
24 |
番禺PY30-1导管架项目脚手架搭设拆除工作Scaffolding building and dismantlement of PY30-1 jacket in Panyu/Huizhou project construction |
16300 Tons |
CNOOC |
11 months |
Qingdao Yard of CNOOC |
AS |
38 |
南堡NB35-2WHPB 导管架的防腐喷涂及脚手架搭设拆除工作Blasting and painting, scaffold erectionand dismantlement of the NB35-2WHPB jacket in Nanbao project construction |
1000 Tons |
CNOOC |
5 months |
Tanggu Yard of CNOOC |
GB |
39 |
蓬莱PL19-3 SPM 和YOKE 项目的防腐喷涂及脚手架搭设拆除工作Blasting and painting of the PL19-3 SPM and YOKE in Penglai 19-3 project construction |
10000 squart meter |
Conocophilips |
8months |
Tanggu Yard of CNOOC |
AS |
40 |
蓬莱19-3项目的防腐喷涂及脚手架搭设拆除工作Blasting and painting of the PL19-3ⅠFPSO in Penglai 19-3 project construction |
14000 squart meter |
Conocophilips |
9 months |
Shanhaiguan Yard |
AS |
41 |
蓬莱19-3 WHPC 项目脚手架搭设拆除工作Blasting and painting, scaffold erectionand dismantlement of the PL19-3WHPC module in Penglai 19-3 project construction |
1000 Tons |
Conocophilips |
13 months |
Tanggu Yard of CNOOC |
AS |
42 |
蓬莱PL19-3 防腐喷涂及脚手架搭设拆除工作Blasting and painting, scaffold erectionand dismantlement of the PL19-3 A module in Penglai 19-3 project construction |
3000 squart meter |
Conocophilips |
1 months |
Tanggu Yard of CNOOC |
AS |
43 |
蓬莱19-3导管架防腐喷涂及脚手架搭设拆除工作Blasting and painting of the module and jacket in Penglai 19-3 Ⅰ project construction |
70000 squart meter |
Conocophilips |
12 months |
Tanggu Yard of CNOOC |
AS |
44 |
蓬莱19-3明珠号防腐喷涂及脚手架搭设拆除工作Blasting and painting of the PL19-3ⅠMingzhu Ship in Penglai 19-3 Ⅰ project construction |
12844 squart meter |
Conocophilips |
2 months |
Tanggu Yard of CNOOC |
AS |
45 |
歧口项目QK18-2项目防腐喷涂及脚手架搭设拆除工作Blasting of the QK18-2 jacket and drill conductor in Qikou project construction |
2310 squart meter |
CNOOC |
2 months |
Tanggu Yard of CNOOC |
GB |
46 |
CFD11WHPA/WGPA 项目防腐喷涂工作Blasting of the CFD11WHPA/WGPA jacket and drill conductor in Caofeidian project construction |
9000 squart meter |
CNOOC |
12 months |
Tanggu Yard of CNOOC |
GB |
47 |
LD10-1CEP 项目防腐喷涂及脚手架搭设拆除工作Blasting and painting, scaffold erectionand dismantlement of the LD10-1CEP jacket in Lvda project construction |
928 Tons |
CNOOC |
8months |
Tanggu Yard of CNOOC |
GB |
48 |
旅大LD5-2 DPP 导管架防腐喷涂及脚手架搭设拆除项目Blasting and painting, scaffold erectionand dismantlement of the LD5-2 DPP jacket in Lvda project construction |
1366 Tons |
CNOOC |
8 months |
Tanggu Yard of CNOOC |
GB |
49 |
LD10-1WHPA防腐喷涂及脚手架搭设拆除工作 Blasting and painting, scaffold erectionand dismantlement of the LD10-1WHPA module in Lvda project construction |
650 Tons |
CNOOC |
7 months |
Tanggu Yard of CNOOC |
GB |
50 |
南堡NB35-2CEP 导管架防腐喷涂及脚手架搭设拆除工作Blasting and painting, scaffold erectionand dismantlement of the NB35-2CEP jacket in Nanbao project construction |
2100 Tons |
CNOOC |
3 months |
Tanggu Yard of CNOOC |
GB |
51 |
旅大LD4-2WHPB防腐喷涂及脚手架搭设拆除工作 Blasting and painting, scaffold erectionand dismantlement of the LD4-2WHPB module in Lvda project construction |
1500 Tons |
CNOOC |
6 months |
Tanggu Yard of CNOOC |
GB |
52 |
渤海BZ25-1C 脚手架搭设拆除工作Scaffold erectionand dismantlement of the BZ25-1C module in Baohai project construction |
1078 Tons |
CNOOC |
12 months |
Tanggu Yard of CNOOC |
GB |
53 |
惠州HZ21-1B 项目脚手架搭设拆除工作Scaffold erectionand dismantlement of the HZ21-1B module in Huizhou project construction |
2000 Tons |
CNOOC |
13 months |
Tanggu Yard of CNOOC |
GB |
54 |
CFD 11 WHPC 防腐喷涂及脚手架搭设拆除工作Blasting and painting of the CFD 11 WHPC module in Caofeidian project construction |
10000 squart meter |
CNOOC |
6 months |
Tanggu Yard of CNOOC |
GB |
55 |
锦州JZ 20-2 NW 组块脚手架搭设拆除工作Scaffold erectionand dismantlement of the JZ 20-2 NW module in Jinzhou project construction |
800 Tons |
CNOOC |
10 months |
Tanggu Yard of CNOOC |
GB |
56 |
渤海BZ25-1WHPA 防腐喷涂及脚手架搭设拆除工作Blasting and painting of the BZ25-1WHPA module in Baohai project construction |
1000 Tons |
CNOOC |
14 months |
Tanggu Yard of CNOOC |
GB |
57 |
南堡35-2CEP模块项目的防腐喷涂工作Blasting and painting of the NB35-2CEP module in Nanbao project construction |
4000 Tons |
CNOOC |
6 months |
Tanggu Yard of CNOOC |
GB |
58 |
蓬莱19-3导管架项目的防腐喷涂及脚手架搭拆工作Blasting and scaffold erectionand dismantlement of the PL19-3WHPC jacket in Penglai 19-3 project construction |
2200 Tons |
Conocophilips |
7 months |
Tanggu Yard of CNOOC |
AS |
59 |
蓬莱19-3WHPB导管架项目的防腐喷涂及脚手架搭拆工作Blasting and scaffold erectionand dismantlement of the PL19-3WHPB jacket in Penglai 19-3 project construction |
2200 Tons |
Conocophilips |
7 months |
Tanggu Yard of CNOOC |
AS |
60 |
百角亭模块项目的脚手架搭设拆除工作scaffold erectionand dismantlement of the module in Bajiaoting project construction |
1000 Tons |
CNOOC |
12 months |
Tanggu Yard of CNOOC |
GB |
61 |
歧口17-2WHPA导管架项目的防腐喷涂及脚手架搭拆工作Blasting and painting, scaffold erectionand dismantlement of the QK17-2 WHPA jacket in Qikou project construction |
1000 Tons |
CNOOC |
7 months |
Tanggu Yard of CNOOC |
GB |
62 |
歧口17-2WHPA模块的防腐喷涂及脚手架搭拆工作Blasting and painting, scaffold erectionand dismantlement of the QK17-2 WHPA module in Qikou project construction |
1000 Tons |
CNOOC |
8 months |
Tanggu Yard of CNOOC |
GB |
63 |
蓬莱19-3WHPB/C导管架钻台项目的脚手架搭设拆除工作scaffold erectionand dismantlement of the PL19-3WHPB/C jacket cap for drilling in Penglai 19-3 project construction |
300 Tons |
Conocophilips |
12months |
Tanggu Yard of CNOOC |
AS |
64 |
澜江船上部模块的防腐喷涂及脚手架搭设拆除工作Blasting and painting, scaffold erectionand dismantlement of the topside module in Lanjiang Ship project construction |
2000 Tons |
CNOOC |
3 months |
Tanggu Yard of CNOOC |
GB |
65 |
印度尼西亚ZPC 导管架项目的防腐喷涂及脚手架搭拆工作Blasting and painting, scaffold erectionand dismantlement of the ZPC jacket in Indonesia project construction |
800 Tons |
CNOOC |
6 months |
Tanggu Yard of CNOOC |
AS |
66 |
印度尼西亚BWA导管架项目的脚手架搭拆工作scaffold erectionand dismantlement of the BWA jacket in Indonesia project construction |
800 Tons |
CNOOC |
6 months |
Tanggu Yard of CNOOC |
AS |
67 |
CFD WHPE导管架项目的防腐喷涂及脚手架搭拆工作 Blasting and painting, scaffold erectionand dismantlement of the CFD WHPE jacket in Caofeidian project construction |
500 Tons |
CNOOC |
6 months |
Tanggu Yard of CNOOC |
GB |
68 |
蓬莱19-3RUP导管架项目的脚手架搭拆工作scaffold erectionand dismantlement of the PL19-3RUP jacket in Penglai 19-3 project construction |
2500 Tons |
CNOOC |
12 months |
Tanggu Yard of CNOOC |
GB |
69 |
蓬莱19-3RUP导管架项目的防腐喷涂工作Blasting of the PL19-3RUP jacket in Penglai 19-3 project construction |
2710 squart meter |
Conocophilips |
10 months |
Tanggu Yard of CNOOC |
AS |
70 |
CFD WHPE 导管架项目的防腐喷涂工作Blasting and painting of the CFD WHPE jacket in Caofeidian project construction |
2435 squart meter |
CNOOC |
1 months |
Tanggu Yard of CNOOC |
GB |
71 |
渤中25-1A模块的防腐喷涂工作Blasting of the BZ25-1A module in Baohai phase project construction |
10000 squart meter |
CNOOC |
5 months |
Tanggu Yard of CNOOC |
GB |
72 |
蓬莱19-3D导管架项目的脚手架搭拆工作scaffold erectionand dismantlement of the PL19-3D jacket in Penglai 19-3 project construction |
2200 Tons |
Conocophilips |
7 months |
Tanggu Yard of CNOOC |
AS |
73 |
蓬莱19-3WHPB模块的脚手架搭拆工作scaffold erectionand dismantlement of the PL19-3WHPB module in Penglai 19-3 project construction |
2200 Tons |
Conocophilips |
7 months |
Tanggu Yard of CNOOC |
AS |
74 |
西江23-1 DDP 的防腐喷涂工作Blasting and painting of the 23-1 DDP guide frame for SPM in Xijiang project construction |
1550 squart meter |
CNOOC |
6 months |
Tanggu Yard of CNOOC |
GB |
75 |
蓬莱19-3WHPD钻井平台的脚手架搭拆工作scaffold erectionand dismantlement of the PL19-3WHPD drilling platform in Penglai 19-3 project construction |
150 Tons |
Conocophilips |
1 months |
Tanggu Yard of CNOOC |
AS |
76 |
蓬莱19-3D模块的脚手架搭拆工作scaffold erectionand dismantlement of the PL19-3D module in Penglai 19-3 project construction |
4800 Tons |
Conocophilips |
14 months |
Tanggu Yard of CNOOC |
AS |
77 |
蓬莱19-3WHPE导管架项目的脚手架搭拆工作Scaffold erectionand dismantlement of the PL19-3WHPE jacket in Penglai 19-3 project construction |
2200 Tons |
Conocophilips |
8 months |
Tanggu Yard of CNOOC |
AS |
78 |
蓬莱19-3WHPB模块的防腐喷涂工作Blasting and painting of the PL19-3WHPB module in Penglai 19-3 project construction |
66253 squart meter |
Conocophilips |
7 months |
Tanggu Yard of CNOOC |
AS |
79 |
锦州9-3E导管架项目的脚手架搭拆工作scaffold erectionand dismantlement of the JZ9-3E jacket in Jinzhou project construction |
500 Tons |
CNOOC |
4 months |
Tanggu Yard of CNOOC |
GB |
80 |
蓬莱19-3D导管架项目的防腐喷涂加脚手架搭拆工作Blasting and painting, scaffold erectionand dismantlement of the PL19-3D jacket in Penglai 19-3 project construction |
2200 Tons |
Conocophilips |
4 months |
Tanggu Yard of CNOOC |
AS |
81 |
渤海二期项目的防腐喷涂及脚手架搭拆工作Blasting and painting, scaffold erectionand dismantlement of the anemometer tower in Bohai phase Ⅱ project construction |
2548 squart meter |
CNOOC |
3 months |
Tanggu Yard of CNOOC |
GB |
82 |
蓬莱19-3WHPE钻井平台的防腐喷涂工作Blasting and painting of the PL19-3WHPE drilling platform in Penglai 19-3 project construction |
9786 squart meter |
Conocophilips |
4 months |
Tanggu Yard of CNOOC |
AS |
83 |
蓬莱19-3RUP项目的防腐喷涂工作Blasting and painting of the PL19-3RUP in Penglai 19-3 project construction |
3300 squart meter |
Conocophilips |
4 months |
Tanggu Yard of CNOOC |
AS |
84 |
蓬莱19-3F模块及蓬莱19-3SPMT模块的脚手架搭拆工作scaffold erectionand dismantlement of the PL19-3F module and PL19-3 SPMT in Penglai 19-3 project construction |
5200 Tons |
Conocophilips |
18months |
Tanggu Yard of CNOOC |
AS |
85 |
蓬莱19-3F导管架项目的脚手架搭拆工作scaffold erectionand dismantlement of the PL19-3F jacket in Penglai 19-3 project construction |
2200 Tons |
Conocophilips |
6 months |
Tanggu Yard of CNOOC |
AS |
86 |
CFD12-1WHPE 上部模块的脚手架搭拆工作scaffold erectionand dismantlement of the CFD12-1WHPE topside module in Caofeidian project construction |
300 Tons |
CNOOC |
6 months |
Tanggu Yard of CNOOC |
GB |
87 |
蓬莱19-3F模块的防腐喷涂工作Blasting and painting of the PL19-3F module in Penglai 19-3 project construction |
54000 squart meter |
Conocophilips |
18 months |
Tanggu Yard of CNOOC |
AS |
88 |
Modec TUPI 项1S,3S,5S,7S FPSO模块的防腐喷涂及脚手架搭拆工作目Blasting and panting, scaffold erectionand dismantlement of 1S,3S,5S,7S FPSO MODULES, in Modec TUPI project constrction |
|
MODEC |
in progress |
Tanggu Yard of CNOOC |
AS |